The Keep River Bridge project was delivered as part of an industry collaboration with Advance Civil Engineering undertaking the installation of the 14 bored piles, the concrete piers and the headstocks.
The following formed Advance's scope of works;
- Supply and installation of 14 bored piles for piers and abutments
- All works associated with clearing of the area to provide access to each site including forming access tracks suitable for all machinery
- Traffic control around the work site
- All necessary environmental works to ensure compliance
- Testing to confirm load and integrity of the piles
- Temporary protection measures to protect piles and exposed reinforcing from damage during the wet season due to the flooding of the river
- Columns and headstocks