The project
Advance Civil Engineering were the successful tenderers for this project which saw the existing culvert crossing replaced with a 3 span, dual lane bridge with a separate cycle path. 
 The Robinson Road connects the two sections of Borroloola. During a significant rainfall event, the Rocky Creek would be inundated closing the road. The alternative route to connect the sections of Borroloola is a 30km trip each way. 
 The construction of the new bridge greatly increases the flood immunity of the bridge reducing closure frequencies and durations. 
 The project aspects include:
- Construction of the 3 span bridge with two traffic lanes and a cycle path.
 - Increasing the flood immunity of the crossing by raising the road surface over one metre and increasing the open flow area under the road.
 - Approximatly 400m of road works for the new alignment.
 - Modification of the street lighting.
 - Batter protection of the bridge approaches.
 